The greenhouse shed project is coming along nicely. As I’ve mentioned before I’m not rushing things along but striving to do things as perfectly as possible. I’m very pleased with the results so far. Side to side and front to back, the greenhouse is almost exactly the same measurement. The greatest difference is about 1/4″ between the longest sides. I figured that’s about as close as I could manage!
I missed updating you on Friday so this post will cover everything we accomplished between Friday and Sunday. Consider it a weekend update!
Tasks completed:
- Framing the windows.
- Framing the patio doors openings.
- Attached the headers.
- Attached crossbeams
- Attached brackets for roof rafters.
The above picture is taken from the long side with the big windows. I was taking the picture of the bracket we’ll use to hang the rafters but I really like the picture for the golden glow of the tulip poplar tree in the background. Fall color will soon be peaking here in Tennessee.
This picture is taken from the back of the greenhouse shed looking toward the house. The large opening framed here is the backdoor where the mowers will be brought in and out through during the mowing season.
What’s next for the Greenhouse Shed?
|
|
That’s the short list!
Previous Greenhouse Posts:
I am amazed with your skills Dave!
Wow, Dave, it's really coming along! I love tulip poplars too—aren't they Tennessee's state tree?—our Colonial family home outside Nashville has such gorgeous poplar floors. Sigh. But I get my tulip poplar hit up here in PA, too, since our neighbor has one right next to our yard!
It's coming along great Dave. Not too much left to do. It will go quickly.
I second Darla — this is so impressive and professional-looking! Wow!
It's coming along quickly Dave, can't wait to see it completed! 🙂